Flowing Well ParkCOMPLETED

Project Scope

Design, construction and renovation of the existing park facilities.

  • improve circulation and green infrastructure
  • repair sections of the stream channel with severe bank erosion which require stabilization techniques to prevent loss of adjacent property and road infrastructure
  • restroom structure allows for additional programming or longer use times for the park and shelter
  • study of pedestrian circulation around the well to resolve cut-throughs of the landscape beds adjacent to parking lot
  • WiFi/Security

Project Timeline

Construction to begin: Spring 2020
Project completion: Summer 2021
*The park will be closed to the public during ?construction