Design, construction and renovation of the existing park facilities.
- improve circulation and green infrastructure
- repair sections of the stream channel with severe bank erosion which require stabilization techniques to prevent loss of adjacent property and road infrastructure
- restroom structure allows for additional programming or longer use times for the park and shelter
- study of pedestrian circulation around the well to resolve cut-throughs of the landscape beds adjacent to parking lot
- WiFi/Security